Barn Conversion Weeks 23 to 24 to 18th December Finished (on the inside)

Still outside work to do though.

A couple of steps lead up into the hallway over the green slated floor showing part of the kitchen including the built in cooker with extractor hood above

Come in

view back to entrance doorway with lounge window to left

view through lounge window

from lounge through to kitchen

kitchen from hallway
kitchen tile

kitchen cupboard
master bedroom

ensuite
part of ensuite

glass feature
floor tiles laid throughout the building

Weeks 1-2Hit the links on the left to follow the construction

Week 3
Week 4
Week 5
Week 6
Week 7
Week 8
Week 9
Week 10
Week 10 and a half
Week 11
Week 12-13
Week 14-15
Week 16
Week 17
Week 18-19
Week 20-22
Back to main page next page